4
DU
Demo userProduction planner
Static demo. A read-only snapshot of Open-MES with dummy data. Browsing, search, sorting and CSV export work; buttons that change data are switched off. Get the real app

TP-100-SA2007-0007

PASS

SA2007 Base frame · Serial SA2007-0007 · 07 Oct 2026

Summary

Procedure TP-100
Tested by
Sam
Date
07 Oct 2026
Work order
1084
14 of 14 steps passed

Comments

No comments recorded.

1. Documentation

2 steps
StepCriteriaResultSign-off
1.1 Latest drawings and test sheet to hand PASS SA
1.2 Test equipment in calibration PASS SA

2. Visual inspection

2 steps
StepCriteriaResultSign-off
2.1 No physical damage; labels legible PASS SA
2.2 All fixings tight and wires labelled PASS SA

3. Dead testing

3 steps
StepCriteriaResultSign-off
3.1 Supply disconnected; no indicators lit PASS SA
3.2 Continuity of all wiring confirmed PASS SA
3.3 Insulation resistance within limits PASS SA

4. Power-up

2 steps
StepCriteriaResultSign-off
4.1 Supply on; status indicators correct PASS SA
4.2 Controller boots without faults PASS SA

5. Functional test

3 steps
StepCriteriaResultSign-off
5.1 All inputs respond as drawn PASS SA
5.2 All outputs operate correctly PASS SA
5.3 Emergency stop and reset work PASS SA

6. Sign-off

2 steps
StepCriteriaResultSign-off
6.1 Comments recorded PASS SA
6.2 Test sheet signed PASS SA