4
DU
Demo user Production planner
Static demo. A read-only snapshot of Open-MES with dummy data. Browsing, search, sorting and CSV export work; buttons that change data are switched off.
Get the real app
Dashboard › Quality › Test reports › TP-100-SA2004-0015
TP-100-SA2004-0015
PASS
SA2004 Valve block · Serial SA2004-0015
· 07 Oct 2026
Summary Procedure TP-100
14 of 14 steps passed
Comments
Back plate to be fitted before dispatch
1. Documentation 2 steps
Step Criteria Result Sign-off
1.1
Latest drawings and test sheet to hand
PASS
AL
1.2
Test equipment in calibration
PASS
AL
2. Visual inspection 2 steps
Step Criteria Result Sign-off
2.1
No physical damage; labels legible
PASS
AL
2.2
All fixings tight and wires labelled
PASS
AL
3. Dead testing 3 steps
Step Criteria Result Sign-off
3.1
Supply disconnected; no indicators lit
PASS
AL
3.2
Continuity of all wiring confirmed
PASS
AL
3.3
Insulation resistance within limits
PASS
AL
4. Power-up 2 steps
Step Criteria Result Sign-off
4.1
Supply on; status indicators correct
PASS
AL
4.2
Controller boots without faults
PASS
AL
5. Functional test 3 steps
Step Criteria Result Sign-off
5.1
All inputs respond as drawn
PASS
AL
5.2
All outputs operate correctly
PASS
AL
5.3
Emergency stop and reset work
PASS
AL
6. Sign-off 2 steps
Step Criteria Result Sign-off
6.1
Comments recorded
PASS
AL
6.2
Test sheet signed
PASS
AL
Open-MES demo
Synthetic data for demonstration only
GitHub v0.1 demo